Septic Field Design: Process, Requirements, and Approvals

Engage a Registered Professional

The first step in installing or replacing a septic system is to complete a Septic Field Design by a Registered Wastewater Professional.
In British Columbia, most systems are designed and installed by Registered Onsite Wastewater Practitioners (ROWPs).

What a Septic Field Design Includes

A proper design package is a comprehensive document detailing:

  • System sizing and treatment level proposed
  • Layout and location of all components (tanks, pumps, field/bed, controls)
  • Construction details and specifications required for a compliant installation

Site Investigation (Pre-Design)

Before design, the professional performs on-site investigation to determine:

  • Soil drainage characteristics and permeability
  • Limiting layers (e.g., high seasonal water table, hardpan, glacial till)
  • Setbacks to critical features:
    • Horizontal: wells, watercourses, steep slopes, property lines
    • Vertical: depth to groundwater, restrictive layers, bedrock
  • Siting considerations: sight lines from the home and high-use areas (avoid visible lids in view sheds, conflicts with decks/paths)
Septic Field Design: Process, Requirements, and Approvals

Choosing Treatment & Siting

A good design balances regulatory setbacks, soil conditions, and family convenience:

  • Where poor soils, tight setbacks, or aesthetics limit options, the designer may specify a higher level of treatment to reduce required setbacks or enable siting.
  • If native soil depth is insufficient to filter contaminants, the designer can select advanced treatment technologies to improve effluent quality before dispersal.

Health Authority Filing & Authorization to Build

Once site work and design are complete, the designer prepares a Record of Sewerage System (RSS) filing and submits it—along with the design—to the Environmental Health Authority.

  • An Environmental Health Officer reviews, stamps, and signs the filing.
  • Only then is the installer authorized to construct the system.
  • If the installer is not the designer, the installation should be collaborative to ensure the build matches the design—miscommunication here is a common cause of failures.

Coordination With Building Permits

The Record of Sewerage System is among the first documents requested when applying for building permits (new builds or additions).

  • There can be months between design completion and installation.
  • During this time, do not disturb the designated disposal field area. Damage from excavation traffic can invalidate the design and force costly compromises.

Final Step: Certification After Installation

After construction, the designer verifies compliance with the design and issues a Letter of Certification.

  • This is submitted to the Environmental Health Authority for sign-off; the system is then authorized for use.
  • The certification must include:
    • An accurate as-built map of all components for future locating under landscaping
    • A comprehensive maintenance plan outlining the steps and schedule to keep the system functioning reliably for years